NFSmith engaged as Solicitor Advocate for a national contractor in relation to a claim against an engineer arising out of a PFI/PPP contract.
The contractor experienced significant design changes in the period post commercial close leaving a cost exposure in excess of £4M.
NFSmith advised the contractor in relation to the preparation of the claims and the dispute resolution methodology. Regular updates on budget timescales and costs provided.
CASE STUDY 2
Drafting building contract for a project manager. NFSmith drafted the contract within a fixed budget and timescale.